2,755 CVs added this Week
329 CVs added in the last 24 hours
778,980 total number of CVs
 
Search CVs
Enter keyword(s):Search tips
Select CV sector:
Enter Town/Country/Postcode
Enter salary range (£)
Advanced search
Ads

CV summary
 
Name ***************
Mobile ***************
Phone ***************
Email ***************
Home address ***************
Location Liverpool
Preferred job type Permanent
 
Career goals
Desired job title Piling Supervisor/Foreman/Operator
Target industry Construction
Target job Site Superintendent
 
Location and travel preferences
I don't want to move
 
Work experience
Years work experience 26
Expected annual earnings £50k - £60k
CV summary
Education

IOSH Working Safely Cert no. 584941
CSCS Supervisors Card Reg no. 00185797
CPCS Approved Validator Reg no. 00185797
CPCS Crane Supervisor (Lifting Operations) No. 00185797
CPCS Piling Rig Bored below 15 tonnes No. 00185797
CPCS Piling Rigs Bored above 15 tonnes No. 00185797
CPCS Crawler Crane (All sizes) No. 00185797
CPCS Compact Crane 360 (Pick and Carry) No. 00185797
CPCS Slinger/Signaller No. 00185797
IPAF Mobile Elevated Work Platforms No. OP/0683459
Abrasive Wheel Certificate
Manual Handling Certificate
First Aid at Work cert no. 1100336393

Discipline Experience: Bored Piling ( Rotary/ CFA/ Driven/ Mini/Support Fluids)
Diaphragm Walls
Off Shore Marine Piling from Jack Up and Spud Leg Barges.
Slope Stabilisation Soil Nailing
Soil Remediation Soil Mixing
Restricted Access Piling
Geothermal Loop Installation

Preferred Location: Fully flexible, as per work requirements. Willing to consider both domestic UK, or Overseas Positions.

Introduction

I have worked in the piling industry since 1985 years during which I have gained a wide variety of experience in different piling techniques but have specialized in large diameter bored piles, both Rotary and CFA disciplines. During my career to date I have worked in both a national and international capacity, having worked overseas for various specialist foundation contractors. During this time I have progressed through different levels of responsibility starting as a general operative, becoming a Rig Operator, and now taking a Foreman/Supervisor role. I believe that I have the initiative and ambition to make the most of every opportunity, and possess strong communication and interpersonal skills that lead to effective working relationships at all levels. 


Employment

1997 - date
Supervisor/Foreman/Rig Operator


Mowlem Piling/Carillion Piling, UK


Having joined Mowlem Piling in 1997 as a Rig Operator, I progressed to the position of Foreman/Supervisor in 2003.

Foreman/Supervisor 2003 to date

Managing all aspects of piling sites, maintaining an efficient, cost effective and safe environment for all staff.
Running the installation of the piles, ordering plant materials, and supervising lifting operations with attendant craneage.
Supervising the piling crew, ensuring tasks are completed to schedule, and foreseeing and resolving any issues.
Maintaining a daily contact with Contract Management, and acting as first point of contact for clients.
Taking responsibility for quality contro on site and mitigating the requirement for remedial works.
Rig Operator:

Installation of piled foundations through the operation of piling rigs, as well as maintaining the rig itself.
Experienced in the operation of the following rigs:
Modern Hydraulic Fixed mast rigs in both Kelly and CFA disciplines, including knowledge of bespoke computer software such as Jean Lutz, NDT, and B Tronic. Model of rigs driven include Bauer, Casagrande, Soilmec, mait, and Delmag.
Front Mounted Drilling Rigs such as Soilmec RT3, Watson, Caldwell, Casagrande, KCA, and CEZ
Diaphragm Wall equipment including Rope, Chandelier, and Hydraulic Grabs.
Crawler cranes including modern hydraulic and older mechanical units.

1996 - 1997
Rig Operator

Keller Foundations, UK


Having returned from work overseas spent a period with Keller Foundations within the UK as a large diameter rig operator.

1995 - 1996
Rig Operator

Various Overseas work with Bauer Malaysia, Bellefinger and Berger


Working as a rig operator on both rotary bored piling rigs and diaphragm wall grabs.

1994 - 1995
Rig Operator Amec Piling, UK


1993
Rig Operator May Gurney, UK


1991 -1993
Rig Operator/Supervisor Imter Scavi & Quatar Piling, Overseas


1989 - 1991
Rig Operator FondacoSolentanche UK Ltd, UK


1985 - 1989
Rig Operator/General Operative Bachy Pigott Foundations Ltd, UK


Recent Projects of Note:

2011 - Stafford and Lincoln Energy from Waste Projects
Large Diameter Rotary Piles Bearing Piles and Secant Wall.

Paddington Integrated Project, Crossrail
Large Diameter Rotary Piles, Secant Wall, Mini Piles, Geothermal Loops
2009 - Airdrie to Bathgate Rail Link
Large Diameter Rotary Piles into rock, DTH Piles, Kingpost Wall
Lambton Coke Works
Soil Mixed Reactive Barrier

2008 Townside Fields, Bury
Large Daimeter CFA
Rosyth Dock Yard
Large Diameter Rotary Piles

2007 City Airport Apron Extension, London
Large Diameter Rotary Piles installed from barges using polymer support fluid

2006 M6 Guardsmill
Large Daimeter Segmental Casing work adjacent to East Coast Mainline.

1999 Excel, Royal Docks, London
Large Diameter Rotary Piles installed from barge using polymer support fluid.


References

Adrian Norridge
Operations Director
Carillion Piling
Mob: